Brisas has made some serious upgrades to it’s water system. In this photo you can see the older hand-dug well (covered by the green roof) that is already connected to the lots in Phase 1 with underground pipes. Brisas has recently installed several new machine-drilled deep wells (one of which is visible in this photo – the concrete block with white tube sticking up) to ensure an ample water supply for all lots.
The new water tower is also complete which will be outfitted with a 10,000 Gallon tank that will provide gravity fed water to all the lots in Phase 1.
Recent Comments