Day in The Life – Holly Beck Obermeyer and Luna at Brisas

Day in The Life – Holly Beck Obermeyer and Luna at Brisas

We are so happy with our new home on lot #22 at Brisas. Here’s a quick little tour looking at what life is like living in Nicaragua with our 5 month old baby girl Luna.

Screen Shot 2015-02-02 at 11.22.16 AM Screen Shot 2015-01-31 at 11.44.00 AM

Advertisements
Quick Tour of a Few of the Lots Available

Quick Tour of a Few of the Lots Available

Brisas Nicaragua is a small residential community in its very early stages in Aposentillo, Northern Nicaragua. The benefit to these lots is private beach access to a beautiful empty beach with great waves Рthe Boom. The community also has good water, easy access from a paved road, power nearby, and flat easily build-able lots.

sunset peak sunset wave view lot 4 view lot 26sunset

Lot #22 House Tour

Lot #22 House Tour

Holly and Kim Obermeyer have been working hard on building their house for the past six months in preparation for the arrival of their baby girl who is due Sept 7th. Right on schedule, the house is nearly finished the first week of August and they are starting to think about moving in. Check out a tour of the house on lot #22.

IMG_20140727_150313

IMG_20140727_150337

IMG_20140727_150412

IMG_20140727_150449

IMG_20140728_181413

IMG_20140729_091436

House in Progress Tour on Lot #22

In Part 2 of our Nesting in Nicaragua series, Holly is one week shy of being six months pregnant and the house has been under construction for five months. The roof is mostly on and you can start to get a feel for what the house will look like. Take a tour of the interior floor plan.
For more from Holly and Kim Obermeyer, check out hipehabitat.com

Holly and Kim Break Ground on their Nicaraguan Nest

We’ve built a few houses/structures in Nicaragua so far, but none are really baby friendly. Either too small, no power, no water, or both, we had been planning the true family house for a while. Once we found out there was baby on the way, we finalized the plan and broke ground on a 1400 sq ft, (1900 including workshop), 2.5 bedroom, 2 bath home on lot #22 at Brisas. We’ve let our team know that the pressure is on to finish the house before September when the baby is due. Will it happen? follow along on our blogs: hipEhabitat.com and saltwatermama.com